Noticias » Estado de los Proyectos » Tangshan Steel 1,700mm HSM Laminar Cooling Starts Operation after Revamping
Tangshan Steel 1,700mm HSM Laminar Cooling Starts Operation after Revamping
2012-09-15 11:11:37
Tangshan Steel 1,700mm HSM Laminar Cooling Starts Operation after Revamping
Tangshan Steel 1

CISDI’s EP Project (made by Chongqing CISDI Heavy Machinery Co., Ltd.) - 1700mm HSM Laminar Cooling Revamping for No.1 Rolling Mill of Tangshan Steel Started up on July 4, 2012.

It takes only four months from signing the contract in the end of February 2012 to start-up of the project. It’s the first cooperation between CISDI and No.1 Rolling Mill of Tangshan Steel.
 
The laminar cooling revamping covers:
▲     Installation of edge masking device to improve the temperature homogeneity across the strip and the product quality.
▲     Side spray water supply system and side spraying device of laminar cooling section are modified to blow off laminar cooling water on top surface of strip, contributing to better temperature control accuracy for strip.
▲     Installation of high efficiency compressed air purging device at the laminar cooling exit, which ensures strip surface quality and temperature detection accuracy.
 
Revamp roller table cooling water, solve problems of the old roller table cooling water spraying on the strip surface that affects strip shape and temperature control accuracy.
 
So far the equipment has operated normally for a month, and has improved finished strip quality.
Inicio | Sobre nosotros | Noticias | Productos | Investigación y desarrollo | Formación | Medios de comunicación | Contacto
Dirección: No.1 Shuanggang Road, Yuzhong District, Chongqing 400013, China.  Código postal: 400013
Copyright by CISDI Group @ 2010